Inspection (Day 99)

Had our independent Pre Plaster inspection and by the look of it PD has also done there framing inspection. As a number of sections contain bright paint & comments.
It would appear some of the issues have been caused when the actual roof scalfolding was installed knocking out some of the roof bracing (trimmers) and chipping a few brick tops.
Another issue which I gather is quite common is the excess bricky mortar running down the inside walls as this will affect the affective draining of moisure if not rectified..
We have also now had most of the heating and cooling system ducting installed.
Hopefully by the end of the month we have all issues resolved from the above 2 reports, bricking completed and cleaned. Eaves and spouting done and plaster installed.
Still think we are about 4 months of a finish date.....








Thursday, 19 January 2012

Top Floor Framing (Day 52)

Continued progress with the top storey taking shape.


South west corner

 Front - south
 Front - south east
 East side
Yesterday b4 top storey framing

Wednesday, 18 January 2012

Framing Underway (Day 50)

Another good day of progress with the frame now taking shape.





Had to chase PD to send us the slab bill, I'm guessing I would be in the minority as normally as it is poured the bills arrives I understand but ours was done about a week ago now.

Tuesday, 17 January 2012

Framing has commenced (Day 49)

The guys have been working in the heat laying out the frame, so hopefully will see something vertical shortly.
In our court there is three houses occupied already and all three took notes and/or pictures of someone on our site inside the fence on the weekend. In the end think it was Procon(?) picking up some excess waffles but good to know your new neighbours are looking out for you.
Will load some photos tomorrow.
Also meeting my SS on Thursday so all very exciting.


Friday, 13 January 2012

Pre Frame (Day 45)

Went on site slab looking cured and site cleaned up for next stage being framing. Nice track marks across the slab and first lot of framing materials on site.
Also see if you pick up the pipe that was runover.